2Nov08 - Dining room before demo
|
Living room from front door before demo
|
Living : storage room
|
|
Fireplace ready for demo
|
Main beam next to fireplace
|
Door into kitchen before demo
|
|
Kitchen nook before demo
|
Another view of the kitchen nook
|
Kitchen door to outside
|
|
Pantry on left; door into guest room before demo
|
Guest room door and wall before demo
|
Our pantry is bare
|
|
Kitchen refridgerater and stove and cabnets
|
Full view of kitchen before demo
|
Another view of kitchen
|
|
Kitchen and corner of kitchen nook
|
Stove, cabnets, and hood before demo
|
Dishwasher and sink before demo
|
|
Microwave, oven, and stove before demo
|
3Nov08 - kitchen from dining room during demo
|
kitchen from dining again
|
|
Door into kitchen from dining during demo
|
Kitchen sink, non-cabnets during demo
|
non-stove, oven and microwave during demo
|
|
Kitchen sink during demo
|
4Nov08 - Brick fireplace on the floor
|
Ignore the fireplace behind the curtain
|
|
More brick on the floor
|
Fireplace from the front door during demo
|
More brick
|
|
Kitchen is gone
|
Pantry is almost gone
|
Kitchen with no stove, oven, etc
|
|
Kitchen with no sink, dishwasher, etc.
|
Brick on the floor
|
Stripped down pantry
|
|
5Nov08 - Kitchen entry from family room
|
Dining entry from family room
|
All that's left of the fireplace
|
|
Door into kitchen from living room
|
Living room after demo of chimney
|
Got roof?
|
|
Kitchen view towards family room
|
Pantry is gone
|
Dining room after demo
|
|
6Nov08 - New ceiling
|
No more fireplace
|
View from living room to kitchen without fireplace
|
|
View from kitchen to living room
|
7Nov08 - View from living room towards family room
|
Kitchen and dining room after demo
|
|
Kitchen nook after demo - working on a new door to guest room
|
View dining:family room from Kitchen
|
Door into guest room - soon to go
|
|
Arlyn comes from school to discover her kitchen is gone.
|
New wall on right, viewing hallway into kitchen
|
Dining room view of family room
|
|
Ready to move door to guest room
|
Living room with no fireplace
|
Kitchen viewing the family room
|
|
9Nov08 - View of family room from living room during Arlyn Bday party
|
11Nov08 - standing on old fireplace area
|
wall between front door and old fireplace
|
|
hallway to kitchen
|
entrance to family room
|
new doorway to guest room off kitchen
|
|
view from kitchen to dining:living rm
|
13Nov08 - pass through wall from dining to kitchen
|
hallway
|
|
new entrance door to guest room
|
framing of new pantry
|
framing of vertical cabinets
|
|
20Nov08 - pass through more complete
|
framing for cabinets above pass through
|
stripped to the studs-window stays
|
|
new ceiling above in kitchen
|
new "temporary" guest room door
|
view from kitchen door to family room
|
|
23Nov08 - pass through with lighting cans
|
pass through toward back door
|
guest room door next to back door
|
|
view of pass through from back door
|
4Dec08 - Drywall going up
|
|
|
|
|
|
|
|
|
|
|
|
|
11Dec07 - Drywall done and mudding started.
|
|
|
|
|
|
|
|
|
|
13Dec08 - Mudding almost complete
|
|
|
|
|
|
|
|
|
16Dec08 - Painting started
|
Kitchen floor covered with felt in preparation for self-leveling the floor.
|
|
|
|
|
|
17Dec08 - Kitchen leveled (self-leveling concret) in preparation for the cabnets and eventual tile
|
|
|
|
19Dec07 - Cabnet installation started.
|
|
|
|
|
|
|
|
|
|
|
|
30Dec08 - Tile partly in - no grout yet.
|
|
|
|
4Jan09 - Tile, cabnets, and lights coming together
|
5Jan09 - The floor is finished
|
|
|
|
|
13Jan09 - more cabnets, room for refridgerator
|
|
|
|
|
|
|
|
|
|
|
|
14Jan09 - refridgerator finally in!
|
|
Now we need a stove...
|
|
|
|
|
|
|
|
Got almost everything but that stove!
|
ready for a new floor
|
The kitchen from the living room
|
|
26Jan09 - the dining room floor is refinshed and we have a stove!
|
The garbage compactor also works as a swim suit dryer.
|
Bench seat in the breakfast nook
|
|
View the new living room floor from the kitchen
|
|
|
|
|
|
30Jan09 - The bench seat is now part of the living:dining room. This side is the dining room.
|
|
This side is the living room
|
The new entryway just inside the front door.
|
While we are tiling the entryway we did the bathroom, too
|
|
Entryway, hallway, bath on the left.
|
The new pantry
|
Breakfast nook bench seat is now painted
|
|
View of the stove
|
New hand-made light in kitchen
|
New hand-made lights over sink
|
|
|
|
|
|
17Feb09: FINISHED (well, except some small details - notice missing plate on box holding 3 switches and GFI under cabnet. Holding up final inspection!)
|
View from dining into kitchen
|
View from kitchen to dining and living rooms
|
|
The new pantry full of stuff
|
View kitchen from the breakfast nook
|
View of kitchen and family room from breakfast nook
|
|
Breakfast nook
|
Kitchen sink with new hand-made lights
|
New Refrigerator
|
|
View of microwave cabnet from family room
|
Dining room table with bench on left
|
Living room with dining and kitchen behind it
|
|
Living room on right, hall way to kitchen on left
|
Living room
|
View after entering the front door. Kitchen on left.
|
|
Polly finally uses her new kitchen!
|
|